Jiangsu Taicang wood industry factory will be clos

2022-09-19
  • Detail

Heavy attack: Jiangsu Taicang wood industry factory closed and evacuated within a time limit

heavy attack: Jiangsu Taicang wood industry factory closed and evacuated within a time limit

December 22, 2017 reading volume: next, let's introduce in detail the operation method and usual maintenance of the bellows ring stiffness testing machine. Leakage inspection and maintenance of all flanges and pipe joints source: Yangcheng Evening News | contribution

[China paint information]

it is understood that, The special action of "two reductions, six treatments, and three promotions" in Suzhou has resolutely cracked down on "messy and dirty" wood production enterprises with zero tolerance. Deadline closure and evacuation continue

on December 20, the notice of closing and evacuating within a time limit was issued to all timber production enterprises in Taicang City again, which strongly pointed out that the production should be stopped immediately from the date of receiving this notice and moved out before January 20, 2018

(check all pictures of any products from packaging containers to medical dispensers in Chinese paint testing)

heavy attack: Taicang wood factory is closed and evacuated within a time limit

Taicang port is a production gathering place for wood manufacturers, and most people rely on wood economy to survive. Closing and evacuating within a time limit, the road of timber is too difficult, and the difficulties are heavy again and again. Friendly reminder from the plate manufacturer: customers in need please order in advance, and please understand the delay of recent goods! No matter how hard the day is, the wood plank people will bite their teeth and survive

Copyright © 2011 JIN SHI