Jiangnao railway EP of CCCC railway design and Res

2022-08-06
  • Detail

CCCC railway design and Research Institute Co., Ltd. will invite bids for the procurement of geotechnical and waterproof materials by the EPC Project Department of the NAO railway

CCCC railway design and Research Institute Co., Ltd. will invite bids for the procurement of geotechnical and waterproof materials by the EPC Project Department of the NAO railway, coating,

CCCC railway design and Research Institute Co., Ltd. will invite bids for the procurement of geotechnical and waterproof materials by the EPC Project Department of the NAO railway

june 9, 2021

CCCC railway design and Research Institute Co., Ltd. will invite bids for the procurement of geotechnical and waterproof materials by the EPC Project Department of the NAO Railway

bidding conditions

july 8, 2020, The people's Government of Xinjiang Uygur Autonomous Region has approved the construction of the project in the official reply to the approval of the new naomao Lake jiangjunmiao railway project (XZH [2020] No. 59). The owner of the project is Xinjiang jiangnao Railway Co., Ltd., the construction funds have been allocated, and the tenderee is the EPC Project Department of CCCC railway design and Research Institute Co., Ltd. The procurement of geotechnical and waterproof materials required for the project has met the bidding conditions, and now public bidding is conducted. The electronic bidding method is adopted for this bidding

project overview and bidding contents

2.1 project overview:

naomao Lake jiangjunmiao new railway project is located in Hami City and Changji Hui Autonomous Prefecture in the northeast of Xinjiang Uygur Autonomous Region. The east end of the line is led from Baishi Hunan Station of hongnao railway, and the west end is led to jiangjunmiao station of Uzbek Jiangshu railway, connecting Lanzhou Xinjiang Railway and EHA railway, forming a new channel out of Northern Xinjiang. The main line is 429.884km long. Due to the high strength and light weight of PAN based carbon fiber composites, it is 300.225km long in Hami City, 129.659km long in Changji Hui Autonomous Prefecture, and 433.093km long in operation; The construction contract amount is 6.98 billion yuan

main works: ① pre station works: subgrade, bridge and culvert, station yard and track; ② Post station works: locomotive, water supply and drainage, power, communication, signal, building, road, station section greening, etc; The total construction period of the project is 30 months; Planned commencement date: April 1st, 2021; planned completion date: September 30th, 2023

the construction task of Jiangyuan naoyuan railway project is jointly undertaken by the first bid of the Third Highway Bureau, the second bid of the Second Highway Bureau and the third bid of Xinjiang Communications Construction Co., Ltd. according to the share ratio of each unit and the mileage section, the engineering tasks are as follows:

(1) the project Department of the first bid of the Third Highway Bureau of Xinjiang Jiangyuan naoyuan Railway: the contract amount is about 1.24 billion, and the construction section dk0 ~ dk78, a total of 78 kilometers. It starts from naomao Lake in Yiwu county and ends at Chahaquan village in Balikun County in the West. 4.1345 million cubic meters of filling and 356000 cubic meters of station earthwork; There are 1 large bridge of 148.43m, 19 medium and small bridges of 836.58m, 9 box bridges of 616.73m, 254 culverts of 3938m, 82.247km of track laying, 75 km of contact lines, 1 traction substation and 22 sets of interlocking turnouts. There are 5 stations (including reconstruction of existing stations), with a building area of 11500m2

(21. automatic shutdown: after the sample is broken) the second bid project Department of Xinjiang jiangnao Railway Second Highway Bureau: the split contract amount is about 3billion, and the construction section dk78 ~ dk270 is 192 km in total. The starting point is located in dongxiagou, Chahaquan village, Balikun County, passing Santanghu town in the West and kumusu in the west, all within the territory of Balikun county. The bridge and culvert works in this section include a total of 4802.32m/63 super large, large, medium and small bridges, 283 frame culverts, 188 circular pipe culverts and 404 prefabricated T-beams. The subgrade in this section is 187.27km long

(3) Xinjiang communications construction section III Project Department of Xinjiang jiangnao Railway: the split contract amount is about 2.74 billion, and the construction section dk270 ~ dk432 is 162 km in total. The starting point is located in kumusu, Balikun Kazak Autonomous County, and leads to jiangjunmiao railway station of Qitai County through Mulei County in the West. The bridge and culvert works in this section include a total of 8765.43m/42 super major bridges, major bridges, medium and small bridges, 12 frame bridges of 2018.1m2, 151 new frame culverts of 1978.2m/m, 122 new circular culverts of 2425.43m/1, and 31.21 new slab box culverts. The subgrade length in this section is 160.731 km

2.2 bidding content:

the bidding materials are: package a: geotechnical materials, and the quantity is tentatively 109474 (M2); Package B: waterproof material, the quantity is tentatively 135455 (M2); Package C: water stop material, quantity is provisional 24992 (m)

see the annex for specific quantity and specification, package division, delivery place, delivery date, technical standards, etc

qualification requirements for successful ignition of the bidder's popular chemical furnace at 16:30 on the 27th

business scope requirements: manufacturers registered in the people's Republic of China according to law, with independent legal personality, general VAT taxpayer qualification, production and business scope of bidding materials, and legal and effective unified social credit code (business license), general taxpayer qualification and other certificates

3.2 production capacity requirements: there is a fixed production and operation site with a certain production capacity, and the production process and equipment must comply with the provisions of relevant national policies. For each index required by the product, there shall be testing equipment and testing record results, and corresponding storage and transportation capacity shall be available

3.3 financial capability requirements: package a: the registered capital shall not be less than 50million yuan; B/c package: the registered capital shall not be less than 100million yuan. The bidder must provide audited financial reports and statements for the past two years (2018-2019), have good financial capital status and have the ability to guarantee funds for the performance of the bidding material contract

3.4 quality assurance capability requirements: it shall have a complete "three standard management system" certification, ISO9001 quality management system certification, ISO14001 environmental management system certification and OHSAS18001 occupational health and safety management system certification, which are within the period of validity. It can provide scanned copies (at least one copy per year) of CMA stamp type quality inspection report of bidding materials issued by professional inspection institutions at or above the provincial level in recent two years (2019 and 2020). The bidding manufacturer must be the entrusted unit for inspection

3.5 supply performance requirements: the enterprise shall belong to the supplier network of the second level subsidiary of China Communications Construction Corporation and above, and have at least 5 supply cooperation performance of the company's engineering projects or national key engineering projects in the recent three years. The average annual comprehensive sales revenue of the enterprise in the recent three years has reached more than 30million yuan, and the enterprise shall be able to provide relevant supporting documents (color scanning copies such as copies of relevant supply contracts and letter of acceptance shall be provided)

3.6 performance credit requirements: no quality safety accident has occurred in the past two years, and has not been included in the list of dishonest Executees, parties to illegal cases, and records of illegal and dishonest acts by "credit China" station; It is required to provide the credit certificate issued by the deposit bank of the basic account of the enterprise and the performance certificate issued by at least three similar bidding materials that have been supplied to the buyer or the user (user reputation evaluation form)

3.7 the consortium bid will not be accepted. Bids from bidders blacklisted by China Communications Construction Corporation will not be accepted

3.8 if the person in charge of the unit is the same person or different units with holding and management relationship, they shall not participate in this tender at the same time, otherwise, the relevant tenders will be rejected

3.9 technical service requirements: it has a professional service management team, and its service awareness and level are at the leading level in the industry

3.10 other requirements: only manufacturers' bids are accepted

3.11 special note: the tenderer can bid for 3 packages at most and win 2 packages at most

qualification review

this bidding adopts "post qualification review", that is, the bidder's qualification is reviewed during bid evaluation. If it does not meet the requirements of the bid documents, it will be treated as abandoned bid

acquisition of bidding documents

5.1 anyone who intends to participate in the bidding, please log in to the material procurement management information system of CCCC (address:; Supplier Portal) from 8:00 on June 9, 2021 to 17:00 on June 15, 2021 (Beijing time, the same below), select "participate" in the bidding, and download the electronic bidding documents after bidding

the bidder must first register as a registered supplier of the material procurement management information system of CCCC () and choose to participate in this bidding. If the supplier belongs to "CCCC Second Highway Engineering Bureau Co., Ltd.", it can directly choose to participate; For new registration, the tenderer shall follow the relevant instructions in the operation manual at the bottom of the supplier login interface, and select "CCCC Second Highway Engineering Bureau Co., Ltd." as the recommended unit; If the company has been registered and belongs to other branches, please choose to add the cooperation intention unit "CCCC Second Highway Engineering Bureau Co., Ltd.". The application description must indicate the intention to participate in the bid of CCCC railway design and Research Institute Co., Ltd. for the geotechnical and waterproof materials of the EPC Project Department of naoyuan railway

5.2 the price of the bidding document is 500 yuan/package (non refundable after sales). The bid price must be remitted from the bidder's basic account to the following account designated by the tenderee (public to public remittance) before bid opening. No other means of payment is accepted. The bid price of geotechnical and waterproof materials must be indicated in the abstract or the description of transfer remittance, and the remittance document must be scanned and sent to the mailbox @, E-mail name: short name of the bidder + bid price of geotechnical and waterproof materials (*), and the scanned copy must be attached to the bid document when submitting the bid document. (the requirements for remittance of bid security are the same)

account name: CCCC railway design and Research Institute Co., Ltd. will open an account in the EPC Project Department of Nao railway.

Bank of deposit: Business Office of Urumqi Economic and Technological Development Zone Branch of ICBC

account number:

Bank Code:

5.3 this bidding only adopts the method of selling bidding documents online and downloading electronic bidding documents online

submission of tender documents

6.1 the time for submission of tender documents is: from 8:00 on June 22, 2021 to 17:00 on June 28, 2021; If the bidder fails to submit a bid within the time limit, it shall be deemed as abandoning the bid. This bidding adopts online bidding through the material procurement management information system of CCCC. Offline bidding is not organized, and paper bidding is not required to be submitted on site. At the same time, the paper tender documents (one original and one electronic USB flash disk) must be sent by SF before bid opening (subject to the document date of the logistics company). The mailing address is: General Contracting Project Department of Xinjiang jiangnao railway project of IKEA Hotel, No. 305, Renmin South Road, Mulei County, Changji Prefecture, Xinjiang. The recipient: Yu xianbo, contact. (the sender's information must be complete, and the outer cover of the sealed package includes the full name of the bidder, the name of the bidding type, the bidding number, the package and other information)

6.2 the PDF electronic bid document uploaded to the bid must be consistent with the paper version of the bid document. In case of any conflict, the PDF electronic bid document shall prevail

6.3 the electronic version of the tender document delivered late will be rejected by the electronic tendering and bidding trading platform, and the paper version of the tender document will also be rejected by the tenderee

media for announcement

this bidding announcement is also published on the Supplier Portal () of the equipment and materials procurement information platform of China Communications Construction (address:)

bid opening

8.1 time of bid opening: 17:00 on June 28, 2021

8.2 place of bid opening: online: CCCC material procurement management information system (); At that time, suppliers can log in to the system to view the bid opening

in case of any change in the above arrangement, the tenderee will issue a notice through the medium of announcement

contact information

tenderee/bidding organization: jiangnao railway EPC Project Department of CCCC railway design and Research Institute Co., Ltd.

address: IKEA Hotel, No. 305, Renmin South Road, Mulei County, Changji Prefecture, Xinjiang

contact person: Yu xianbo

:

email: @

project contact person:

contact person of Xinjiang jiangnao railway bid I Project Department of CCCC Third Highway Engineering Bureau: Xin

Copyright © 2011 JIN SHI